Case Studies

Mr Shelton
3.99 kWp
Roof Mounted system
Commissioned Date: 03/06/2011

“I’m very happy with my system it doesn’t look out of place on my 16th century building and it make us feel like we’re doing something towards reducing our own carbon footprint which is something we’ve always wanted to do. It was painless to put in and the installation team were on time and were very quick and efficient. I’ve had a lot support from SUNfarming Solar Systems after my installation with help with registration for the feed-in tariff, so overall I’m very happy.”

 

 

Mrs Varker
3.99 kWp
Roof Mounted System
Commissioned Date: 01/07/2011

“They did every thing they said they would, they came on time, only took two days, and all together were very quite and efficient.”


 

 

Other installations we have installed include: 

49.92kWp, 2013, Redhill (Surrey)

49.92kWp, 2012,  Liss (Hampshire)

  

 3.71kWp, 2011, Berrynarbor (Devon)

 

3.9kWp, 2011, Chagford (Devon)

24.96kWp, 2012, Ashford (Kent)

29.6kWp, 2012, Bridport (Dorset)

48kWp, 2011, Horley (Surrey)

Mr Jones
1.38 kWp Roof Mounted System
Commissioned Date: 26/08/2011

Mrs Turnbull
1.33 kWp Roof Mounted System
Commissioned Date: 22/07/2011

Stokeinteignhead primary school
3.91 kWp Roof Mounted System
Commissioned Date: 02/06/2011

Mr Williams
3.99 kWp Roof Mounted System
Commissioned Date: 07/09/2011

Mr Willars
1.33 kWp Roof Mounted System
Commissioned Date: 02/09/2011

South Devon College
1.33 kWp Roof Mounted System
Commissioned Date: 07/06/2011

 